The Scaffold Handover Certificate Template – Australia is offered in multiple formats, including PDF, Word, and Google Docs. These templates are fully editable and printable, ensuring they cater to your specific requirements effortlessly.
Scaffold Handover Certificate Template – Australia Editable | PrintableSample
1. Project Information 2. Handover Date 3. Scaffold Details 4. Compliance and Inspections 5. Responsibilities of the Parties 6. Acknowledgment of Handover 7. Signatures of Acceptance
PDF
WORD
Examples
Project Name: [Project Name]
Project Address: [Project Address]
Project Manager: [Manager’s Name]
Contact Number: [Manager’s Phone]
This certificate is issued on [Handover Date].
Scaffold Type: [Type of Scaffold]
Scaffold Location: [Specific Location on Site]
Height: [Height of Scaffold]
Installed By: [Installation Company’s Name]
The scaffold has been inspected and is found to be in compliance with all relevant Australian standards and regulations, including AS/NZS 1576.
All safety measures and procedures were adhered to during the installation and handover process including the proper signage, safety nets, and personal protective equipment.
It is the responsibility of the contractor to ensure that the scaffold remains safe and secure until it is dismantled.
This certificate acknowledges the successful handover of the scaffold.
[Installer’s Signature]
[Installer’s Name]
[Company Name]
Date: [Date]
Project Name: [Project Name]
Site Address: [Site Address]
Client: [Client’s Name]
Contact Person: [Contact Person’s Name]
This certificate is presented on [Handover Date].
Type: [Type of Scaffold]
Purpose: [Purpose of Use]
Location: [Specific Area on Site]
Height: [Height Measurement]
Erected By: [Erector’s Name]
The scaffold has been fully inspected in accordance with Australian standards, ensuring it is safe for use in construction activities.
It is confirmed that safety protocols were strictly followed, including the use of adequate fall protection and scaffolding safety measures.
The client assumes responsibility for maintaining the scaffold’s integrity until it is dismantled.
This document certifies the formal handover of the scaffold to the relevant personnel.
[Handover Representative’s Signature]
[Handover Rep’s Name]
[Company/Organization Name]
Date: [Date]
Printable
